The mosaic that once lined the walls of the YMCA survived the building’s demolition, and will eventually be located on an expansion planned for the Salem Riverfront Carousel. After a long delay, fundraising for the project will begin in 2023.
The mosaic that once lined the walls of the YMCA survived the building’s demolition, and will eventually be located on an expansion planned for the Salem Riverfront Carousel. After a long delay, fundraising for the project will begin in 2023.